Konstantis, S., & Massinas, S. (2020). Box Jacking/Pushing Method for Tunnel Construction in Rock: Doha Metro, Gold Line Project. Proceedings of the International Conference on Civil Infrastructure and Construction (CIC), 2020(1), 680–689. https://doi.org/10.29117/cic.2020.0088