[1]
S. Konstantis and S. Massinas 2020. Box Jacking/Pushing Method for Tunnel Construction in Rock: Doha Metro, Gold Line Project. Proceedings of the International Conference on Civil Infrastructure and Construction (CIC) . 2020, 1 (Apr. 2020), 680–689. DOI:https://doi.org/10.29117/cic.2020.0088.